Watermark Place

Watermark Place is set right on the River Thames close to the heart of the Financial District of London. It offers 12 storeys of […]

Click here to read more

Click here to read more

One New Change, London

One New Change is located in Central London and offers a mixed occupancy of offices space, shops, cafes and restaurants. The building itself covers […]

Click here to read more

Click here to read more

Business Design Centre, Islington

The Business Design Centre was built in the 1860’s and is now a Grade II listed building. It has been many things over the years, […]

Click here to read more

Click here to read more

Queensgate Shopping Centre, Peterborough

Clear Line have supplied and installed the new roof lights to the entire shopping centre on a Principal Contractor basis.
Throughout the duration of the works the shopping centre has been open and fully functioning at all times including throughout Christmas one of the busiest shopping periods of the year.

Click here to read more

Click here to read more

Southmead Hospital Redevelopment Project, Bristol

Working closely with Carillion Construction and BDP Architects, Clear Line were responsible for the design, fabrication and installation of an internal 5000m² Fire Rated glazed façade, believed to be the largest single Fire Rated screen in the UK.

Click here to read more

Click here to read more

Southfields Community College, London

We have worked closely with our Client to increase the thermal performance of the windows by replacing single glazing with double glazing . This involved the extrusion of a purpose made aluminium bead.
A U Value of 1.1 for the replacement glass was achieved.

Click here to read more

Click here to read more

Sizewell ‘A’ Roof Refurbishment, Suffolk

Clear Line were selected to conduct a full built up felt roof replacement at Sizewell Nuclear Power Plant. We were asked to strip and replace using specified IKO PLC roofing products.

Click here to read more

Click here to read more

Endcliffe Village, Sheffield

This is a term project in Sheffield at the Student Village.

Clear Line are called to site for window and door remedials. We are required to react to a call within 4 hour of being notified and in most cases must have the problem rectified within 10 days of the initial report.

Click here to read more

Click here to read more

Strata Building, London

Clear Line were appointed to supply and install a number of high rise double glaze units. We used the insitu BMU cradle for the replacements.

The building was occupied at the time of works and no disruptions were recorded by any of the tenants.

Click here to read more

Click here to read more