Clear Line have been appointed by our Client to increase the thermal performance of the window system and add a cladding system to upgrade the old building aesthetics to match the new build element of the complex.

We have worked closely with the Client and suppliers to design bespoke cill  pressings and a purpose made aluminium bead. These will be paired with new double glazed units to achieve an overall U value of 1.1 ultimately increasing the thermal performance of the window systems.

Trespa panels will be supplied and fixed onto the concrete  using ‘Z’ angles and bolts. This will then upgrade the original building to meet the visual aspects of the new building on the complex.

Health and Safety has been critical on this project due to the community college being occupied throughout the duration of the works. All operatives on site are required to have a full CRB check in place before commencing on site. Special provisions have been necessary for delivery of materials, as the only access to site is directly through the yard of the new build community college.